
GDK Lead Free Automatic SMT Soldering Machine High Speed Ten Temperature Zones Nitrogen Reflow Oven
Shenzhen HTGD Intelligent Equipment Co., Ltd.- After-sales Service:Technical Support, Maintenance Services,
- Condition:New
- Certification:CCC, RoHS, CE
- Warranty:12 Months
- Automatic Grade:Automatic
- Installation:Vertical
Base Info
- Model NO.:GDK-1003N
- PCB Maximum Width:400 mm (Optional :610 mm)
- Number of Heating:up 10 Under 10
- Cooling Areas:up 3 Under 3
- Transport System:Single Guide
- Transport Package:Export Wooden Box
- Trademark:GDK
- Origin:China Shenzhen
- Production Capacity:2000sets,Year
Description
Equipment configurationNumber of heating Up 10 Under 10 cooling areas Up 3 Under 3 Control system Siemens PLC+ Modular PLC+PID Control Windows 10, Free Switching in English and Chinese Online Temperature control mode PID closed-loop control SSR drive Nitrogen-filled distribution Each temperature zone is equipped with nitrogen filling port, which can realize nitrogen filling in the whole area Standard N consumption 300-1000ppm,20-25M³/h Transport system Single guide Transport control mode Imported inverter + imported transport motor Chain structure Nickel-manganese Steel Chain Plating 35B Single Buckle and Pin Shaft Guide rail structure Whole two-section Guide rail width 50 mm-400mm (50 mm-610mm optional) Upper cover start Electric opening of upper cover for cleaning in furnace UPS power supply Standby power Heating Rectifier Plate Structure Thickened aluminium sheet Cooling mode Cooling of external water cooler Packing mode of transport General packing + provincial land transportation Warranty Warranty period: two years (two years of non-human malfunction, replacement of repair parts provided free of charge by equipment supplier, alloy track, heating module and high temperature motor for five years) 


















------------FAQ----------------------------------------------------
Q: What we can do for you?
A: Total SMT Machines and Solution, professional Technical Support and Service.
Q:Are you a trade company or a manufacturer?
A: OEM & ODM service are available.
Q: What is your delivery date?
A: The delivery date is about 35 days after receipt of payment.